Tuesday, March 9, 2010

Filmes Gratis De Insesto

Appeal to the President and HE the Prefect of the Province

Acquacalda, February 12, 2010

CASTA
non-partisan Committee Land Conservation

Acquacalda
e-mail casta08@alice.it
http://comitatocasta.blogspot.com/

Tel 0909821123 c / o Enzo Mottola
Str Prov.le Acquacalda
98055 Lipari



Ill.mo President
Province
98100 Messina

His Excellency Mr. Prefect

98100 Messina


Even our last appeal,'s invitation, Mr. President, October 23, 2009, fell on deaf ears.

We regret to note that what has happened, happens and will happen to Acquacalda and its inhabitants did not raise any interest in the political class. Interest, which, in contrast, suddenly wakes up at the approach of elections. But we well aware that, unfortunately, this is not a new fact or, still less, limited to a few politicians.

What angers us most is the absolute inertia exposed by his administration against our village, seeing the many and now a new problem, we make daily life very difficult, remain unsolved miserably in the sight of all, and if possible, worse.

What value are the many promises, proclamations, commissions and missions of experts, if we all remain unchanged?

What happened to the task force that would monitor the entire archipelago?

- and work for the safety of the road network provincial and particularly Acquacalda Porticello ", which she calls, already February 17, 2009," projects "and funding (approximately three million euro as your letter No. 41115, 30. 12. 2008)? We want to hope that the few patches, recently played with a little 'asphalt into the holes of the most obvious, is not the aforementioned and promised long-awaited intervention. If this would be a shameful insult to our intelligence and a monstrous challenge to the already enormous patience amply demonstrated by us citizens of the village.

- And the remedial action for the urgent demolition of the pier Italpomice?

- and the intervention in defense of the cliff, attacked from the sea, continues to threaten the static nature of the entire upper area of \u200b\u200bthe township? (The first cordoned off the area was carried out in 2006).

- And the ordinance on the practicability of 180 in the area pomicifera, pending execution of the works to channel storm water that overflows from the pit, filling the roadway with a continuous avalanche of debris? (It should be noted that, to date, as indicated by a sudden, mocking and subtle signs, the notorious stretch of road would be closed to transit. Therefore, the passage, necessary for us, it would be illegal and to our peril as is evident that any liability, civil or criminal, can not fall back on that government authorities).

Any conflicts at personal, partisan bickering and misunderstandings because they have so heavily penalized?

All questions that are left without any concrete solution, despite our numerous appeals, demonstrations and protests.

The continuous up against this wall of rubber aggravates it and leads us to the progressive total lack of trust in authority should administer both locally, at both central and leads us to reject, as of now, the hypocrite presence of any delegations contrite "state funeral".

Regards.

Enzo Mottola
President CASTA

0 comments:

Post a Comment